A ROOM THAT WORKS FOR YOU
Setting Up a Temporary Kitchen During a Remodel
Plan meals, dishwashing, food storage, and household access before your kitchen is taken out of service.

Identify the unavailable functions
Ask when the sink, cooking appliances, refrigerator, and kitchen access will be interrupted. Establish what can remain usable and what must be moved. Build the temporary arrangement around the actual construction sequence rather than assuming partial access every evening.
Choose a practical location
Keep food and clean dishes away from the work zone and dust. Plan safe appliance use according to their instructions and suitable electrical service. Discuss any temporary appliance move or connection with the appropriate trade rather than improvising it.
Simplify daily routines
Set aside essential utensils, a small dishwashing plan, and meals that fit the temporary setup. Label packed items and keep children and pets away from construction access. Have a backup plan for delays caused by hidden conditions or unavailable materials.
Before you decide
Can the refrigerator stay in place?
That depends on the layout and scope. Confirm access, protection, and moving responsibilities before work starts.
When can I use the new counters and sink?
Wait for the installer’s release after required installation, connection, testing, and curing steps are complete.
