A ROOM THAT WORKS FOR YOU
Planning a Window in a Shower Remodel
Review privacy, window condition, waterproofing connections, and tile layout when a shower includes an existing window.

Inspect before designing around it
Photograph the frame, sill, surrounding wall, and any staining. Decide whether the window stays or will be replaced before tile dimensions are finalized. Hidden damage and replacement lead time can change the construction sequence.
Resolve the wet-area connection
Ask how the selected waterproofing system will meet the window assembly and how the sill will drain. This detail depends on the window and surrounding construction. Paint or a decorative tile return alone does not explain the complete water-management plan.
Coordinate privacy and maintenance
Consider sight lines from outdoors, daylight, access to operate the window, and cleaning around handles. Review trim depth and tile cuts together. Confirm the actual window specifications with the supplier before treating a photo as an approved wet-area product.
Before you decide
Can the old window stay?
Possibly, after its condition and compatibility with the planned wet-area details are assessed.
When should a replacement be ordered?
After dimensions and specifications are confirmed, early enough to coordinate installation before surrounding finishes close the opening.
