A ROOM THAT WORKS FOR YOU
Should New Flooring Run Under Cabinets?
Cabinets, islands and flooring must be sequenced as a system. The answer differs between a floating floor and other approved installation methods.

Identify what is fixed in place
Mark cabinets, islands, built-ins and other heavy fixed objects on the room plan. Explain which will remain and which are being replaced. The installer needs that information before choosing where flooring stops and how exposed edges are finished.
Read the specific flooring rule
A floating floor must be installed according to its requirements around fixed objects; those requirements cannot be assumed from a glue-down or tile installation. Ask for the selected product’s instruction covering cabinets and expansion. Review the island attachment plan before flooring begins.
Coordinate appliances and future changes
Flooring boundaries can affect appliance removal and later cabinet replacement. Compare the finished heights inside appliance openings and at toe kicks. Include any infill, trim or transition work in the proposal so the cabinet sequence does not leave unfinished strips or trapped equipment.
Before you decide
Can I decide after the flooring is installed?
The cabinet and floor sequence should be settled first. Changing it later may require removing planks, altering trim or revisiting the approved installation method.
