A ROOM THAT WORKS FOR YOU
Flooring Installation Preparation: A Homeowner Checklist
Prepare rooms, furniture, delivery access and daily routines before flooring installation so the agreed work can proceed with fewer surprises.

Confirm the moving responsibilities
List furniture, electronics and appliances in each work area. Agree which items the crew will handle and which you will move before arrival. Empty cabinets or furniture that must be moved when requested, and keep personal, fragile and valuable items out of the work zone.
Plan access, deliveries and room use
Identify the entry route, parking or unloading constraints and a dry location for materials that meets the product requirements. Discuss pets, children and how the household will move between usable rooms. If work must be phased, agree the sequence before the first room is cleared.
Review finish details before the old floor comes out
Confirm the product, direction, transitions, baseboards and disposal arrangements. Point out known leaks, squeaks and damaged areas. Keep contact information available for decisions about conditions revealed during removal, and ask how changes will be documented before additional work proceeds.
Before you decide
Should I disconnect appliances myself?
Follow the agreed project responsibilities and use qualified help where required. Do not assume moving includes every disconnection or reconnection.
When can furniture go back?
Ask the installer for the release time appropriate to the installed products and any adhesives or coatings used.
