A ROOM THAT WORKS FOR YOU
Countertop Template Checklist: What to Confirm Before Measuring
Prepare for countertop measurement by coordinating cabinets, sink and faucet specifications, overhangs, supports and the fabricator’s requirements.

Ask the fabricator for its readiness requirements
Confirm what must be installed, secured or on-site before the template visit. Do not assume every supplier uses the same process. Share the cabinet plan and identify any unfinished panels, changes or appliance details that may affect the final measurement.
Finalize the openings and edges
Choose the sink, faucet arrangement, edge profile and backsplash plan. Review cutouts, seams and overhangs with the fabricator. If a workstation sink or special accessory is involved, provide its exact model information rather than substituting a general basin dimension.
Coordinate supports and the return visits
Discuss island or seating overhang support and any electrical or plumbing work that affects the area. Establish who disconnects and reconnects fixtures and who completes the backsplash afterward. Keep the work area accessible and confirm the installation date only after the supplier provides it.
Before you decide
Can the sink model change after templating?
A change may affect cutouts and fabrication. Contact the fabricator before changing the approved model.
Does countertop installation include plumbing connections?
Not automatically. Confirm the responsibility and scope in writing.
